Skip to content
LiteSource
We Make Lighting Simple
Our Manufacturers
Education
LiteSource On Demand
AIA Approved Courses
Presentation Library
Course Calendar
Inspiration
News & Events
Our Company
Our Services
Our People
Careers
Reach Out
Dist. Log In
Our Manufacturers
Education
LiteSource On Demand
AIA Approved Courses
Presentation Library
Course Calendar
Inspiration
News & Events
Our Company
Our Services
Our People
Careers
Reach Out
Dist. Log In
Lighting Controls Field Service Request
Step
1
of
7
- Field Service Type
14%
This Field Service Request serves as the official agreement between Litesource and the requesting Electrical Contractor listed herein.
What Type of Service Do You Need?
(Required)
NEW PROJECT LIGHTING CONTROLS FIELD SERVICE
EXISTING PROJECT RETURN TRIP
WARRANTY WORK
CONTROLS SYSTEM EVALUATION/REPLACEMENT
The item below applies to any level of Field Service including Return Trips
OWNER TRAINING: Once Field Service dates have been scheduled, the Electrical Contractor shall coordinate a day and time with the end-user (Owner) and the assigned Lighting Controls Technician for Owner Training. If owner training is unable to be completed within the scheduled startup date(s), a Billable Return Trip will be required. Refer to Acknowledgement.
Lighting Controls System Order
Please choose the level of Field Service required:
Basic
BASIC
Basic
(INCLUDED WITH LIGHTING CONTROL SYSTEM ORDER)
BASIC field service requests must be completed and received by Litesource a minimum of 14 Business Days prior to requiring a lighting controls technician on site.
BASIC field service includes:
1 hour for a Pre-Installation Meeting held remotely via Microsoft Teams or in person at Litesource’s Raleigh office. The purpose of this meeting is to familiarize the Electrical Contractor with the lighting controls provided for the project. Topics include but are not limited to; submittal drawings review, product operation and design intent, installation requirements and common installation issues to avoid. The Electrical Contractor is responsible for scheduling this meeting with Litesource prior to lighting controls rough-in. The Electrical Contractor must have access to a physical full-sized, color submittal drawing or a .pdf of the drawing for this meeting.
Confirmation phone call within 24 hours of this request submission between the Lighting Controls Technician and the EC contact listed on this request form. This call is for coordinating the exact date, time of day and location of the required field service appointment and to answer any preliminary questions.
Basic functionality check for all areas at the start of the appointment to identify any issues and ensure site readiness.
Up to 1.5 hours assisting the Electrical Contractor troubleshoot electrical wiring and controls cabling.
On-Site programming of the lighting controls per the Sequence of Operation (SOO) provided in the Construction Documents or per current NC Energy Code requirements if a SOO is not provided or available.
Identification of any product manufacturing or firmware defects affecting the functionality of the system
Verification of any time schedules required.
DMX programming if DMX controls are provided by Litesource.
Coordination with Systems Integrator for BACnet Integration when specified.
2-hours On-Site Owner/End User Training
EC and Owner sign-off
A Field Service Report will be provided to the E.C. for record.
BASIC field service excludes:
Re-terminating bad cables
Sensor Tuning
Return Trips due to Site Readiness
Weekend / After Hours / Holiday work
I agree to the privacy policy.
Advanced
ADVANCED
Advanced
(OPTIONAL – IF SELECTED A QUOTE WILL BE PROVIDED FOR THIS SERVICE)
ADVANCED field service requests must be completed and received by Litesource a minimum of 14 Business Days prior to requiring a lighting controls technician on site.
ADVANCED field service includes all BASIC items and the items below:
1 qty 2-hour On-site Pre-Installation Meeting with a Litesource controls representative.
2 qty 2-hour On-Site Installation Checkup visits.
1 qty 2-hour On-Site Pre-Commissioning walk-through visit.
Up to 3 hours troubleshooting wiring or cabling issues.
Sensor Tuning and testing of all sensors.
Generating relay panel schedules if required.
ADVANCED field service excludes:
Re-terminating bad cables
Return Trips due to Site Readiness
Weekend / After Hours / Holiday work
A Purchase Order must be provided to Litesource before ADVANCED field service is scheduled.
I agree to the privacy policy.
Return Trip Service Work
(CHOOSE IF THE ORIGINAL FIELD SERVICE WAS UNABLE TO BE COMPLETED DUE TO SITE READINESS OR OWNER TRAINING NOT SCHEDULED) RETURN TRIPS for field service requests must be completed and received by Litesource a minimum of 14 days prior to requiring a lighting controls technician on site. A Purchase Order must be provided to Litesource before a Return Trip is scheduled.
Warranty Work
If selected, a quote will be provided for this service. If Litesource receives a lighting controls order from this opportunity, a credit for this service will be reflected in the order.
Controls System Evaluation/Replacement
Included if manufacturing defects, faulty devices or programming issues are found by the Lighting Controls Technician during Field Service.
Expedited Service?
(OPTIONAL ADD-ON TO BASIC OR ADVANCED – IF SELECTED A QUOTE WILL BE PROVIDED FOR THIS SERVICE)
EXPEDITED field service requests must be completed and received by Litesource a minimum of 7 days prior to requiring a lighting controls technician on site. Expedited startup services are available on a case-by-case basis depending on technician availability. A Purchase Order must be provided to Litesource before expedited service is scheduled.
Do you need to expedite the service?
(Required)
No
Yes
Earliest Start Date
Month
Day
Year
Must be GREATER than today
Latest Start Date
Month
Day
Year
Must be GREATER than or equal to 'Earliest Start Date'
Site Open Time
Hours
:
Minutes
AM
PM
AM/PM
Site Close Time
Hours
:
Minutes
AM
PM
AM/PM
PO Number
Project/Site Name
(Required)
Address
(Required)
Street Address
Address Line 2
City
State / Province / Region
ZIP / Postal Code
Afghanistan
Albania
Algeria
American Samoa
Andorra
Angola
Anguilla
Antarctica
Antigua and Barbuda
Argentina
Armenia
Aruba
Australia
Austria
Azerbaijan
Bahamas
Bahrain
Bangladesh
Barbados
Belarus
Belgium
Belize
Benin
Bermuda
Bhutan
Bolivia
Bonaire, Sint Eustatius and Saba
Bosnia and Herzegovina
Botswana
Bouvet Island
Brazil
British Indian Ocean Territory
Brunei Darussalam
Bulgaria
Burkina Faso
Burundi
Cabo Verde
Cambodia
Cameroon
Canada
Cayman Islands
Central African Republic
Chad
Chile
China
Christmas Island
Cocos Islands
Colombia
Comoros
Congo
Congo, Democratic Republic of the
Cook Islands
Costa Rica
Croatia
Cuba
Curaçao
Cyprus
Czechia
Côte d'Ivoire
Denmark
Djibouti
Dominica
Dominican Republic
Ecuador
Egypt
El Salvador
Equatorial Guinea
Eritrea
Estonia
Eswatini
Ethiopia
Falkland Islands
Faroe Islands
Fiji
Finland
France
French Guiana
French Polynesia
French Southern Territories
Gabon
Gambia
Georgia
Germany
Ghana
Gibraltar
Greece
Greenland
Grenada
Guadeloupe
Guam
Guatemala
Guernsey
Guinea
Guinea-Bissau
Guyana
Haiti
Heard Island and McDonald Islands
Holy See
Honduras
Hong Kong
Hungary
Iceland
India
Indonesia
Iran
Iraq
Ireland
Isle of Man
Israel
Italy
Jamaica
Japan
Jersey
Jordan
Kazakhstan
Kenya
Kiribati
Korea, Democratic People's Republic of
Korea, Republic of
Kuwait
Kyrgyzstan
Lao People's Democratic Republic
Latvia
Lebanon
Lesotho
Liberia
Libya
Liechtenstein
Lithuania
Luxembourg
Macao
Madagascar
Malawi
Malaysia
Maldives
Mali
Malta
Marshall Islands
Martinique
Mauritania
Mauritius
Mayotte
Mexico
Micronesia
Moldova
Monaco
Mongolia
Montenegro
Montserrat
Morocco
Mozambique
Myanmar
Namibia
Nauru
Nepal
Netherlands
New Caledonia
New Zealand
Nicaragua
Niger
Nigeria
Niue
Norfolk Island
North Macedonia
Northern Mariana Islands
Norway
Oman
Pakistan
Palau
Palestine, State of
Panama
Papua New Guinea
Paraguay
Peru
Philippines
Pitcairn
Poland
Portugal
Puerto Rico
Qatar
Romania
Russian Federation
Rwanda
Réunion
Saint Barthélemy
Saint Helena, Ascension and Tristan da Cunha
Saint Kitts and Nevis
Saint Lucia
Saint Martin
Saint Pierre and Miquelon
Saint Vincent and the Grenadines
Samoa
San Marino
Sao Tome and Principe
Saudi Arabia
Senegal
Serbia
Seychelles
Sierra Leone
Singapore
Sint Maarten
Slovakia
Slovenia
Solomon Islands
Somalia
South Africa
South Georgia and the South Sandwich Islands
South Sudan
Spain
Sri Lanka
Sudan
Suriname
Svalbard and Jan Mayen
Sweden
Switzerland
Syria Arab Republic
Taiwan
Tajikistan
Tanzania, the United Republic of
Thailand
Timor-Leste
Togo
Tokelau
Tonga
Trinidad and Tobago
Tunisia
Turkmenistan
Turks and Caicos Islands
Tuvalu
Türkiye
US Minor Outlying Islands
Uganda
Ukraine
United Arab Emirates
United Kingdom
United States
Uruguay
Uzbekistan
Vanuatu
Venezuela
Viet Nam
Virgin Islands, British
Virgin Islands, U.S.
Wallis and Futuna
Western Sahara
Yemen
Zambia
Zimbabwe
Åland Islands
Country
Cross Street
Electrical Contractor Contact Information
EC Contact Company
(Required)
EC Name
(Required)
First
Last
EC Contact Phone
(Required)
EC Contact Email
(Required)
On-Site Contact Information
On-Site Contact Company
On-Site Contact Name
First
Last
On-Site Contact Phone
On-Site Contact Email
Electrical Contractor Site Readiness Responsibilities
Readiness #1
(Required)
Select
Yes
No
N/A
All control devices have been installed per the manufacturer’s installation instructions in locations per the approved submittal drawings and are powered. Any device damaged during installation has been replaced and is powered. No devices are missing our un-installed.
Readiness #2
(Required)
Select
Yes
No
N/A
All Lighting Fixtures are installed and powered. If fixtures have not been installed in a specific zone due to backorder, long lead time or owner-furnished, a temporary fixture has been installed. Control functionality cannot be verified if no lighting fixture is connected to the associated control zone. A temporary fixture allows the technician the ability to check that the associated controller is operating correctly.
Readiness #3
(Required)
Select
Yes
No
N/A
All 0-10V wiring has been checked for proper installation. 0-10V wiring can be checked without the use of controls by shorting the 0-10V wires together. Shorting the + and the – 0-10V wires will dim all fixtures in a control zone sharing the same 0-10V pair to the lowest level or off depending on the driver. Opening the wires will result in the fixtures being full output.
Readiness #4
(Required)
Select
Yes
No
N/A
All switch legs have been checked and match up with the 0-10V dimming wires for the associated control zone.
Readiness #5
(Required)
Select
Yes
No
N/A
All pre-terminated Category (CAT5e/CAT6) cables have been installed between the devices as shown on the submittal drawings. Cable routing can differ from the submittal drawings but not how the devices are shown interconnected. All cables have been plugged into the required devices.
Readiness #6
(Required)
Select
Yes
No
N/A
Field-terminated Category cables have been provided by the installing contractor, they have been terminated per TIA/568 B, have been tested with a LAN tester and are seated securely in the devices.
SITE TERMINATED CATEGORY CABLES SHOULD BE AVOIDED DUE TO THE NUMBER OF IMPROPER TERMINATIONS FREQUENTLY FOUND AND SHOULD ONLY BE USED FOR LONG RUNS OVER 100’ OR WHEN A PROJECT REQUIRES CATEGORY CABLES BE INSTALLED IN CONDUIT.
Readiness #7
(Required)
Select
Yes
No
N/A
UL924 devices have been wired per the manufacturer’s installation instructions and tested. Emergency circuits are energized, and emergency neutrals are NOT shared with normal neutrals. 0-10V dimming wires are connected such that emergency lighting and normal lighting in the same area dim correctly together.
Readiness #8
(Required)
Select
Yes
No
N/A
All occupancy or vacancy sensors have been adjusted (“tuned”) beyond the factory defaults per the construction documents, specifications or owner’s requirements. * All sensors are capable of being either Occupancy (auto on/auto off) or Vacancy (manual on/auto off). Electrical Contractor is responsible for ensuring all sensors and/or powerpacks are wired and adjusted for either Occupancy or Vacancy depending on what is specified on the construction documents. * Tuning sensors is required to ensure the sensor operates effectively in the space and location it is installed. Sensitivity/Time Out trim pots, buttons or dip switches shall be adjusted per the manufacturer’s installation instructions. Lights that stay on, turn off prematurely or do not turn on at all are directly related to sensor tuning. Sensor tuning IS NOT included in BASIC field service. Litesource will not perform a site visit to troubleshoot sensor operation.
Readiness #9
(Required)
Select
Yes
No
N/A
Relay Panel(s) installed and powered, all relay schedules have been typed or written describing each load and provided at each relay panel.
Readiness #10
(Required)
Select
Yes
No
N/A
If the project requires a time schedule to control lighting, Electrical Contractor shall provide the Technician required On/Off times and days for each area where a time schedule is required.
Readiness #11
(Required)
Select
Yes
No
N/A
Integration: If the project requires integration into another control system, the Electrical Contractor shall schedule the other control system vendors to be present when the Technician is on-site. Any cabling or wiring between the Lighting Control system and another control system shall be by the Electrical Contractor.
Readiness #12
(Required)
Select
Yes
No
N/A
Site has will be prepped for Field Service. Preparation includes: For Digital Systems: Removal of ceiling tiles where room controllers are installed. Digital Switches are unscrewed from their wall boxes allowing access to connecting cables Ladders are available for the technician. As-Built with cable paths as installed are available If DMX fixtures are installed, the addressable DMX module is accessible without requiring the technician to disassemble the fixture. If BACnet integration is required, the Systems Integrator contact information has been provided to Litesource. Electrician responsible for the lighting controls installation is available during the Field Service.
NOTE TO THE ELECTRICAL CONTRACTOR:
(Required)
Items 1-7 above are the most common issues seen during startup visits.
Unless ADVANCED Field Service has been chosen, ALL 0-10V, switch leg, incorrect Category Cable routing/ termination issues and improperly wired UL924 devices are the responsibility of the Electrical Contractor and not the Lighting Controls Technician or Litesource. The Lighting Controls Technician may provide on-site guidance to the Electrical Contractor for corrections to be made but it is the sole discretion of the Lighting Controls Technician to deem whether the site is ready for Field Service. Any additional trip required will be considered a Billable Return Trip.
Billable Return Trip
If the Lighting Controls Technician arrives on site to find the lighting controls and/or lighting fixture installation is incomplete, installation quality is poor/ not per manufacturer’s installations instructions and/or the site readiness has been misrepresented, the Field Service may not be completed as scheduled or may be canceled at the discretion of Litesource. In either case, if a Billable Return Trip becomes necessary, the Electrical Contractor is responsible for the cost of all additional trips. A quote for the Billable Return trip will be provided to the Electrical Distributor associated with the project’s original controls order. A Purchase Order must be provided to Litesource before scheduling the return trip. Leadtime for Return Trips are 14 days from receipt of the Purchase Order.
The Lighting Controls Technician will provide a punch list to the Electrical Contractor listing corrections that need to be made prior to the Return Trip.
If corrections can’t be made to provide complete and correct controls functionality within the dates assigned for the initial Field Service, the Electrical Contractor is responsible for rescheduling the Field Service as a Return Trip using the webform located here:
https://www.litesourcenc.com/lighting-controls-startup-request-form/
A quote will be provided to the customer by Litesource. The Return Trip Date will be scheduled after Litesource receives a Purchase Order.
Under no circumstances is Litesource responsible for back-charges related to construction schedule delays due to electrical installation issues which prevents the Lighting Controls Technician from completing programming and training within the timeframe established.
I understand.
I understand my responsibilities, as an employee or representative of the Electrical Contractor listed in this Field Service Request, to ensure the site is ready or will be ready for Lighting Controls Field Service on the dates chosen.
I understand that if Lighting Controls Field Service including Owner Training cannot be completed in full at the time the Lighting Controls Technician is scheduled, that I am responsible for all costs associated with a Billable Return Trip.
Signature
(Required)
Go to Top
Subscribe to our mailing list
*
indicates required
Email Address
*
First Name
Last Name
×
Our website uses cookies to enhance your browsing experience and analyze site traffic. By continuing to use our site, you consent to the use of cookies.
Accept >